
On September 9, 2026, the Everett Post published a sponsored feature on Pacific Pro Group by writer Phil Vandervort. The article describes our Edmonds design-build work on home additions, permits and construction. You can read the Everett Post feature here.
Can we add space and stay in the house we already have?
Homeowners often want more room without leaving the neighborhood they already live in. A home addition can expand the house you have, whether that is a bedroom, an office or a family room designed to match the existing architecture.
Most homeowners can remain in the house during an addition. We take steps to limit the disruption, including temporary walls to contain dust, clear work zones so the rest of the house stays usable, and advance notice when a utility has to be interrupted.
What do you look at before anyone draws a plan?
Every project starts with a meeting. We talk through your goals and budget, gather what we need to know about the existing property, and write a scope of work. Next we run a detailed feasibility study to understand zoning requirements and the structural possibilities of the addition or remodel you have in mind. That study also tells us which specialists the work may need, such as a structural or geotechnical engineer, a land surveyor, or a critical area consultant when wetlands, floodplains or shorelines are involved. If you want a first look at what a lot allows, the same free feasibility study is a good place to begin.
How do design, permits and construction stay on one path?
Pacific Pro Group is a design-build firm. Design, permit management, interior design and construction are handled as one process, so you are not left coordinating a separate designer and builder. Our team prepares floor plans and room layouts from your ideas and photos, presents two options, and revises them with you.
We then compile the reports, structural drawings and engineering drawings the city requires, submit the set and follow the review. Permit services cover the application, approvals and the inspections that come later. We work with permitting departments in Edmonds, Snohomish County, Seattle and King County.
What happens while the city is reviewing the permit?
While the permit is in review, you work with our team to choose finishes, fixtures and materials. Those choices go into a detailed cost estimate. When the design and materials are approved, we sign a construction contract, and the project moves into the build once the permit is approved.
Who keeps the job on track once construction starts?
Project managers oversee the build, with a focus on quality, safety and clear communication. They coordinate subcontractors, manage the schedule in Buildertrend and meet city inspectors for the required site inspections. We also post updates in Buildertrend so you can follow the work. When the job is complete, we walk the house with you, hand over the warranties and close out the project.
What if we are planning a kitchen or a bathroom?
The same path applies to kitchen and bathroom remodels, and to interior design help with layouts, finishes and fixtures. To see completed work, visit our portfolio, including the Magnolia rebuild and addition in Seattle.